Skip to main content

UH Clear Lake STEM Building

Project Status: Design
Project Budget: $67,500,000.00
Project Delivery: 

Project Team

Project Manager: Mark Gill
Principal PM: Jim Norcom
Planning Rep:
Design Team: FKP
Contractor/CM: Tellepsen

Description

The STEM and Classroom Building is a $65.7 million project for the University of Houston-Clear Lake. The 127,000 gross square foot building (including  15,000 gsf of shell space) will house classrooms as well as teaching and research labs for the departments of mechanical  engineering, physical  sciences, and environmental  science/industrial hygiene.  Additionally, this project includes the construction of the Bayou Loop Road connector. The Bayou Loop Road connector will connect Bayou Road East with Bayou Road West along the northern boundary of the campus. The road is anticipated to utilize the northernmost driving lane of Lot D, be a total length of approximately 1,500 feet of 2-lane road, and be constructed with a curb and gutter
system.

 

 

UH CLear Lake rendering.